The current enabling works will include the grouting of old mine workings, the installation of the main surface water and foul drainage outfalls and the construction of two SUDS ponds.Cycle lanes will be installed to create a link to the town centre.Development Division is delighted to announce that, after many years of planning and preparation, work has started on Phase 1 of our North Dunfermline site.

After the Civil Engineering elements have been completed, IHB will remain on site as Principal Contractor, until the overall completion of the project and handover to the Client.

All imported aggregates for road and crane hardstanding construction is to be a recycled material.

Although this isn’t a Bo P contract, IHB are responsible for all the cable trench works including excavation, backfill and environmental reinstatement as guided by the Client’s environmental specialist.

The project will run through to March 2017 and is a Design & Construct in accordance with NEC option A.

OWL have installed WSP as their onsite representative. Civil Engineering Division is pleased to announce that we have been awarded the Beckburn Wind Farm contract close to the village of Longtown, near Carlisle in Cumbria.